高清无码a视频在线观看,国内精品视频一区二区三区,免费观看18禁黄网站,午夜亚洲AV日韩AV无码大全

Load test running of Tanzania TPCC project was successfully conducted

Pubdate:2014-07-21

 

At 15:30 local time, 14 July, the cement mill load test running of Tanzania TPCC CM5 project was successfully conduct, which signifies crucial achievement of the project.

TPCCCM5 project is an expanded cement mill system besides No. 4 mill contracted by Sinoma Tianjin. There are a lot of problems, such as, limited space, the matching with old line, the dust issue from the old etc. However; the load test running of the cement mill was successfully conducted despite those difficulties.
 


 

 

 

 

Related Information

 | Contact UsFormer Website | Site Map

Copyright @ 2010 Sinoma International Engineering Co., Ltd. Jing ICP Reference No.: 05020504